|
|
3.
Left: Looking south-east in the theatre. The framing
for the upstage wall has been started. |
||
|
|
|||
|
4a. Centre: Gene Gallant on the ladder is framing the wall that separates the theatre and the gallery. |
|
||
|
|
|||
|
4b. Right: Same view with the framing completed. You can see where the double-door entrance will be from the gallery into the theatre. |
|||
|
5. Left: The east wall (upstage wall) is now completed and the doors to backstage installed. |
|||